Mercado Tech Brasil

Method

Agile projects with cybersecurity

We bring agile management, process design and information security together in one method. Every stage relies on references the market recognizes, cited at the end of the page, and ends with deliverables you can check.

The four stages

The same path works for a one-off assessment, a fixed-scope project or a monthly allocation: the depth changes, not the order.

  1. 01AssessmentUnderstand the business and the risks
  2. 02AS-IS → TO-BE designTarget process and secure integrations
  3. 03Short sprintsShort, validated deliveries
  4. 04Secure operationMonitored, protected production
Team in an interview about the process

AS-IS map with bottlenecks and volumes

Stage 01

Assessment

We understand the business goal, the systems involved and the risks before proposing any solution.

What we do

  • Interviews with the people who run and decide
  • Current flow, systems and personal data involved
  • Waste: waiting, rework and manual steps
  • Initial security and privacy risks

What you get

  • AS-IS map with bottlenecks and volumes
  • Prioritized risk list
  • Plan with priorities, estimate and indicators
Person drawing the process flow on a whiteboard

TO-BE process validated with your team

Stage 02

AS-IS → TO-BE design

We design the target process, the integrations and the security controls before writing any code.

What we do

  • Target process in BPMN 2.0, with rules and exceptions
  • Integration architecture: APIs, queues and authentication
  • Security and privacy from the design stage
  • Threat modeling of the integrations and the data

What you get

  • TO-BE process validated with your team
  • Verifiable security requirements (OWASP ASVS)
  • Initial backlog prioritized by value and risk
Two people reviewing a delivery on a laptop

A working increment every cycle

Stage 03

Short sprints

We deliver in short cycles, with your team validating every increment.

What we do

  • Scrum (sprints of up to a month) or Kanban with WIP limits
  • Transparent backlog, reviewed every cycle
  • Security every sprint: review, tests and dependencies
  • Review and retrospective to adjust course

What you get

  • A working increment every cycle
  • A board with progress and impediments
  • Flow indicators: throughput, cycle time and item age
Server room in operation

Operations and incident runbook

Stage 04

Secure operation

We go live with controls that hold up after the project ends.

What we do

  • Least privilege, vaulted secrets and reviewed access
  • Logs and monitoring without unnecessary personal data
  • Incident response and recovery plan
  • Knowledge transfer and documentation

What you get

  • Operations and incident runbook
  • Dashboard with gain and delivery indicators
  • Continuous-improvement recommendations

Principles

  • Value before technology

    We automate first what cuts waiting, rework or risk.

  • Secure by design

    Security and privacy requirements go into the backlog with the features, not at the end.

  • Incremental delivery

    Working software in short cycles, with feedback from the people who use it.

  • Transparency

    Backlog, risks and indicators visible to your team at all times.

  • Minimal data

    We process only the personal data needed for the purpose, as the LGPD requires.

  • Measure to improve

    Every delivery has a before-and-after indicator.

How we measure

We agree on the indicators during the assessment and track them all the way to operation.

Market references

Frameworks, standards and laws we build on. The links open on each source’s website.

  1. The Scrum Guide (2020) Ken Schwaber and Jeff Sutherland Sprint accountabilities, events and artifacts: Product Goal, Sprint Goal and Definition of Done.
  2. The Kanban Guide Kanban Guides Work-in-progress limits and flow metrics: throughput, cycle time and work item age.
  3. Manifesto for Agile Software Development (2001) agilemanifesto.org Values and principles behind incremental delivery and customer collaboration.
  4. PMBOK® Guide Project Management Institute (PMI) Stakeholder, risk and project governance management.
  5. Lean Thinking: the five Lean principles Lean Enterprise Institute Value, value stream, flow, pull and continuous improvement to find waiting and rework in the process.
  6. BPMN 2.0.2 Object Management Group (OMG); also published as ISO/IEC 19510 Notation for the AS-IS and TO-BE processes, readable by business and IT.
  7. NIST Cybersecurity Framework (CSF) 2.0 (2024) National Institute of Standards and Technology (NIST) Six functions to organize security risks: Govern, Identify, Protect, Detect, Respond and Recover.
  8. NIST SP 800-218: Secure Software Development Framework (SSDF) NIST Secure development practices applied in every sprint, from preparation to vulnerability response.
  9. OWASP Application Security Verification Standard (ASVS) OWASP Foundation Verifiable security requirements for applications and APIs, used as acceptance criteria.
  10. ISO/IEC 27001:2022 ISO and IEC Requirements for an information security management system and the Annex A reference controls.
  11. Brazilian General Data Protection Law (LGPD, Law 13,709/2018) Brazilian Presidency (Planalto), in Portuguese Purpose and necessity principles (art. 6) and security from the design of the product or service (art. 46, § 2).
  12. DORA software delivery metrics DORA (DevOps Research and Assessment) Delivery throughput and stability: deployment frequency, change lead time, change fail rate and recovery time.

Want to apply the method to your process?

Tell us which process or project you want to improve. The initial assessment is free and with no strings attached.