Review: stakeholder analysis and the power-interest grid

Published on · Project Management · by William Garcia

Stylized map made of dots
Photo: Topher · WordPress Photo Directory (CC0, public domain)

Projects rarely fail for lack of technique. Far more often, they run into someone who was not heard at the right time. The material in this review is a completed activity example from a project management course, with two slides: a stakeholder analysis table and a power-interest grid. The case is Office Green, the course's sample company, which is preparing a new service called Plant Pals. It is useful for anyone starting a project who needs to decide whom to talk to, how often and in how much depth.

The table: understanding each stakeholder

The first slide organizes each stakeholder into seven columns: who they are, their role in the project, how they are involved, the impact they feel or may cause, their level of power or influence, their level of interest and the form of engagement. Power and interest are rated high, medium or low.

The example lists five stakeholders:

  • the director of product, the project sponsor, with high power and medium interest, who should get regular but not daily updates;
  • the landscape and web designer, a team member, with high power and interest and daily contact;
  • current clients and employees, who can give feedback on the experience and should be consulted as needed;
  • the investors, barely involved today but watchful of the project's effect on the company's performance;
  • the receptionist, with low power and low interest, who needs to be briefed before launch to answer questions.

What caught my attention most is the impact column, which records possible resistance. The designer, for example, supports the project but may resist if their own role is affected. It is the kind of detail that usually stays only in the project manager's head and that, once written down, becomes an action plan.

The grid: prioritizing effort

The second slide asks the student to drag each stakeholder onto the power-interest grid, divided into four quadrants:

  • high power and high interest: manage closely, with more effort;
  • high power and low interest: keep satisfied, with high priority;
  • low power and high interest: show consideration, keeping the person informed;
  • low power and low interest: just monitor, with minimum effort.

The grid does not replace the table; it summarizes it. The table explains each person, and the grid shows where to spend communication time, which is always a scarce resource.

What I take into practice

In process automation projects, the lesson of the impact column is even stronger: almost every automation changes someone's routine, and that is usually where silent resistance comes from. In my practice, I do this mapping right at the start and include stakeholders many teams forget, such as the information security team and the person in charge of data protection. They may have low day-to-day interest, but they have the power to block a go-live.

I also revisit the grid at every phase. Interest and power change over the course of a project, and a stakeholder who seemed peripheral can move to the center once the system goes into production.

Is it worth using?

Yes. It is a short, clear example that is easy to copy into any project. The combination of table and grid is simple enough to actually be used, not just to tick a box in the plan.